| 1 |
RAW MATERIAL - (A) Non Metalic Parts, (B) Metalic Parts |
| A) |
LINING MATERIAL |
| Intactness |
Visual |
100% |
P.O. Specification & Product
Data sheets |
Supplier MTC or
COC |
✖ |
✖ |
✔ |
✖ |
✔ |
| Grade confirmation |
✖ |
✖ |
✔ |
✖ |
✔ |
| Physical verification |
✖ |
✖ |
✔ |
✖ |
✔ |
| B) |
VALVE BODY,
SIDE-PIECE,
BALL(INSERT),
PLUG(INSERT) &
DISC(INSERT). |
Chemical & Mechanical
Properties per approved
GAD / QAP / PO
Specification |
Chemical &
Mechanical Property |
1 Sample / Size /
Heat or as per PO
Specification |
Manufacturer / Supplier TC
or NABL Lab. TC |
EN-10204 -TYPE -
3.1 TC |
✖ |
✖ |
✔ |
✖ |
✔ |
| 2 |
IN-PROCESS |
| A) |
VALVE BODY,SIDEPIECE,
PLUG, BALL
(INSERT) |
| Porosity Check |
Spark Test(NA for
Anti.Static Material) |
100% |
UNP Spark Test Procedure |
Final Insp.
Report |
✔ |
✔ |
✔ |
✖ |
✖ |
| Physical verification |
Visual |
| Dimensions |
Measurement |
100% |
UNP Mfg. Drawings |
UNP Inward IR |
✔ |
✔ |
✔ |
✖ |
✖ |
| 2 |
FINISHED PRODUCTS |
|
CS+PFA LINED
BALL VALVE.
CS+PFA LINED
PLUG VALVE.
CS+PFA LINED
BUTTERFLY VALVE. |
| Leakage Test
(Shell or Body Test) |
Hydrostatic Test |
100% |
UNP Hydro Test Procedure or
Approved GAD |
Final Insp.
Report |
✔ |
✔ |
✔ |
✔ (10%) |
✔ |
| Leakage Test
(Seat Test) |
| 1. Hydrostatic Test |
100% |
UNP Hydro Test & Pneumatic
Test Procedure or Approved
GAD |
Final Insp.
Report |
✔ |
✔ |
✔ |
✔ (10%) |
✔ |
| 2.Pneumatic test
pressure |
✔ |
✔ |
✔ |
✔ (10%) |
✔ |
| Lining Intactness |
Spark Test
(NA for Anti.Static
Material) |
100% |
UNP Spark Test Procedure or
Approved GAD or @20 KVDC |
Final Insp.
Report |
✔ |
✔ |
✔ |
✔ (10%) |
✔ |
| Lining thickness |
Thickness Check |
100% |
3.2 MM Minimum |
✔ |
✔ |
✔ |
✔ (10%) |
✔ |
| Dimension Measurement |
Dimension Inspection |
100% |
As per Approved GAD or As
per UNP Assly. As Built
Drawing |
Final Insp.
Report |
✔ |
✔ |
✔ |
✔ (10%) |
✔ |
| Workmanship |
Visual |
100% |
✔ |
✔ |
✔ |
✔ (10%) |
✔ |
| 3 |
FINAL INSPECTION |
| 3.1 |
PAINTING |
| 3.1 |
LINED VALVE |
DFT Final Shade,Visual |
DFT Final Shade,Visual |
100% |
UNP Painting Procedure or
Customer PO
specification/As per
Approved Drawing/As per
Approved Data Sheet |
IR |
✔ |
✔ |
✔ |
✖ |
✖ |