1 |
RAW MATERIAL - (A) Non Metalic Parts, (B) Metalic Parts |
A) |
Polymer |
Intactness |
Visual |
100% |
P.O. Specification & Product
Data sheets |
Supplier MTC or
COC |
✖ |
✖ |
✔ |
✖ |
✔ |
Grade confirmation |
✖ |
✖ |
✔ |
✖ |
✔ |
Physical verification |
✖ |
✖ |
✔ |
✖ |
✔ |
B) |
STEM. (Major Parts) |
Chemical & AS per
approved GAD / QAP /
PO Specification (Major ELEMENTS) |
Chemical
analysis |
1 Sample /
Size / Heat or
as per PO
Specification |
Manufacturer /
Supplier TC or NABL Lab. TC |
TC |
✖ |
✖ |
✔ |
✖ |
✔ |
2 |
FINISHED PRODUCTS |
|
PLASTIC
VALVES |
Leakage Test
(Body & SEAT) |
Hydro test |
100% |
Hydro Test Procedure or
Hydro test Approved GAD |
Final Insp.
Report |
✔ |
✔ |
✔ |
✔ (10%) |
✔ |
Dimension, Workmanship |
Measurement, Visual |
100% |
As per Approved GAD or
As per UNP Assly. As Built
Drawing |
Final Insp.
Report |
✔ |
✔ |
✔ |
✔ (10%) |
✔ |
3 |
FINAL INSPECTION |
|
PLASTIC
VALVES |
Documents
Verification |
Review Of
Material
Stamping and
Issue of IRN |
100% |
Approved Drawing /
PO |
IR |
✔ |
✔ |
✔ |
✖ |
✖ |
Marking & Tagging |
Visual |
100% |
Approved Drawing |
IR |
✔ |
✔ |
✔ |
✖ |
✖ |